Category Archives: Projects

11th Installment

Ok, I will have to admit that what you are going to read is hearsay. I have been off getting blasted and primed, and have not been witness to any of this. As I indicated last month, Gregg really did … Continue reading

Posted in Projects | Leave a comment

Tenth Installment

Ok, here is the ugly truth about tube and fabric construction. When you are involved in a major rebuild, as I am, you have to put everything together so you can take it apart. I know, this sounds crazy, but … Continue reading

Posted in Projects | Leave a comment

Installment Nine

Last time we talked, I was all excited about getting control cables and floor boards. This does not sound like a lot, but the Devil is in the Details! Apparently, there are some issues that complicate the process. On its … Continue reading

Posted in Projects | Leave a comment

Installment Seven

OK, now it is my turn to see progress. Last time it was all about ailerons. Frankly, I am tired of that. I am a steel tube aircraft, and I want to be done with the steel tube work so … Continue reading

Posted in Projects | Leave a comment

Installment Eight

OK, OK, I am now on wheels, but what about the rest of my critical parts. Don’t get me wrong, it is great to be on wheels again (2 of 3). Hay that is 66%, which is passing in many … Continue reading

Posted in Projects | Leave a comment

Installment Six

Last time we talked, I was off to the welder. You will also remember that I knew several things were on the schedule, but had no idea of what to expect upon my return. Well, as it turns out I … Continue reading

Posted in Projects | Leave a comment

Installment Five

As you are now aware, a new tail structure is now available. It has been assembled using Piper PA-12 prints to achieve the finished product. All looks well, it should fit, but will it fit? Sometimes I do not hear … Continue reading

Posted in Projects | Leave a comment

Installment Four

Last time we talked, Gregg was working on laying out the longerons and associated tubing. One thing that is a twist to this process is that the two sides are not the same. You remember those special bends for tail … Continue reading

Posted in Projects | Leave a comment

Feb 28 2011 Third Installment

Time is passing, and Gregg is busy on several fronts. I really do not care about school, but I am getting attention from several major directions. As I indicated earlier, there has been a controlled cutting process going on. A … Continue reading

Posted in Projects | Tagged | Leave a comment

Jan 24 2011 Second Installment

Just a note from the EAA 670 Secretary Greg has been sending these to me and with all my PC problems I am just now getting to update his posts. Special thanks to Greg for keeping them coming! As I indicated in … Continue reading

Posted in Projects, Uncategorized | Leave a comment